Salvation Army Lodge Renovation

Starke, FL



This project was a complete interior and exterior renovation of the existing 2 story camp hotel type ‘Lodge Building’ used to house the camp staff members. All interior materials were removed including drywall, insulation, carpet, hard tile, vanities; water damaged wood framing, light fixtures, electrical circuits, plumbing fixtures etc, to basically remove any materials that could have absorbed moisture. The building was inspected and fumigated for termites and fogged for mold and mildew. The exterior walkways and balconies were removed and replaced with new concrete walkways. New aluminum guardrails were installed at all walkways and balconies. The wood siding and trim were repaired and replace as necessary and painted.


Status Completed
Location Starke, FL
Size 10,842 sf
Duration 4 months
Completed June 2011
Architect Scherer Construction
Construction Type Design/Build