GoodYear Tire

St. Johns, FL

Overview

STATUS

Completed

Location

St. Johns, FL

Duration

7 months

Completion Date

June 2015

Size

5,950 SF

Type of Construction

Design/Build

About the Project

This project is the new construction of a 5,950 SF CMU/brick and steel building with cabinetry, storefront, doors and hardware, overhead doors, metal studs and metal deck, awnings (Mapes Canopy or equal), EIFS/stucco, drywall and acoustical ceilings, finished concrete floors and tile, signage, equipment, fire protection and MEP for a complete tire center.