Davis Express Trucking Office

Starke, FL



This project consisted of a 12,000 sf “hardened structure” of masonry block and structural steel. The exterior wall system is reinforced concrete masonry with brick veneer. The structural system included tube steel columns, steel beams, bar joists, structural roof system with a modified bituminous roof system over the metal deck. Hurricane resistant glass was installed in the dispatch area. The building includes office spaces, dispatch center, kitchen, lobby, and bathrooms.


“I called Scherer Construction after driving by one of their jobsites because I was impressed by how clean their jobsite was and how professionally they applied themselves to the project.”
– Jimmy Davis, Owner

Status Completed
Location Starke, FL
Size 12,000 sf
Duration 3 months
Completed May 2007
Architect Scherer Construction
Owner Davis Express Trucking
Construction Type Design/Build