Camp Keystone Multipurpose Building

Starke, FL

Overview

STATUS

Completed

Location

Starke, FL

Duration

10 months

Completion Date

2004

Size

15,067 SF

Type of Construction

Design/Build

About the Project

This Design/Build project was a 15,067 square foot pre-engineered metal building multipurpose facility. This facility included a wrap around porches, a worship auditorium with a stage, a curtain wall system, meeting/classroom spaces and large gang bathrooms. The scope also included minimal site grading, a new sanitary system lift station and septic system, brick paved circular driveway, and landscaping along the disturbed areas.
“Another quality project completed by Scherer”

– Tony Bellis, Camp Manager