Overview
STATUS
Completed
Location
Hillsborough County Airport, FL
Duration
9 months
Completion Date
June 2009
Size
12,000 SF
Type of Construction
Design/Build
About the Project
This project was a 100’x120’x16’ clear height pre-engineered bulk storage hangar, concrete slab, site work and infrastructure improvements. The hangar is for bulk storage of aircraft and has manually operated rolling doors on an embedded rail system, a single phase electrical service, emergency lighting, interior/exterior lighting, static grounds, and general purpose receptacles. Plumbing consists of a new bathroom, mop sink, floor drains, hose bibs, lift station, and oil water separator. Site work consists of clearing, grading, asphalt parking apron, pavement markings, tie downs, retention pond construction, domestic water, sanitary sewer, lift station, underground electrical, fire hydrant, and repair of existing hangar doors.
“Scherer impressed us with their professionalism and expertise by not only providing design services, but also becoming a partner in the process”.