Overview
STATUS
Completed
Location
Alachua, FL
Duration
18 months
Completion Date
March 2014
Size
2,100 LF of Roadway
Type of Construction
Site Improvements
About the Project
This project was for the City of Alachua and consisted of roadway and drainage improvements for the NW 150th Avenue and 142nd Terrace roadways. The scope of work included an underground retention system, new storm drainage system, domestic water and sanitary sewer work, street lighting conduits and pole bases, complete reconstruction of the roads, new sidewalks and brick paver crosswalks, and landscaping. Also included in the scope was the reconstruction of the baseball field that the retention system was buried beneath and the reconstruction of a City of Alachua owned parking lot.