Overview
STATUS
Completed
Location
Gainesville, FL
Completion Date
Fall 2016
Type of Construction
Construction Management
About the Project
This project was for the completion of the pump station for Depot Park. The first phase was for pre-construction services which included exploratory excavation of the site to determine what objects might interfere with the proposed valve vaults. The construction phase included the partial demolition of an existing 24″ water main, installation of the stormwater force main piping, valves, vaults and pumps. Additionally, the electrical services for the pumps, setting the control panel for the pumps, 6″ of concrete paving, pipe bollards, and the final course of asphalt.